Every occupied building needs fresh air. In New Zealand, ventilation is covered by the Building Code (Clause G4), and the detail is usually met through the relevant standards and acceptable solutions. A designer or engineer confirms what applies to your project. Here is what drives the numbers.
What sets the requirement
- Occupancy. More people means more fresh air, and more CO₂ and moisture to remove.
- Floor area and use. A gym, a kitchen, a classroom and an office all have different needs.
- Equipment and processes. Cooking, printing, chemicals and heat-producing equipment add loads.
- How airtight the building is. Modern buildings rely on designed ventilation, not leaks.
When natural ventilation is not enough
Openable windows work for some spaces some of the time. Internal rooms, noisy or polluted streets, security needs, air conditioned spaces and high-occupancy rooms usually need mechanical ventilation.
Options
- Supply and extract fans for simple spaces and wet areas.
- Ducted mechanical ventilation serving several rooms with filtered air.
- Heat recovery ventilation such as Daikin VAM or Mitsubishi Electric Lossnay, which recovers energy so you are not heating or cooling all the fresh air from scratch.
- CO₂-controlled ventilation that ramps up when rooms fill and eases back when they empty.
Getting it right
We calculate the ventilation requirement, select equipment, design the ducting and commission and balance the airflows. Read more about commercial ventilation systems or request a site assessment.